In
Melbourne services limited I was opportunity need to work with many department
but specifically I worked with the it be
department
HSE: Health and Environmental Safety here I
handled so many activities which includes
AIM OF HSE:
· To
protect the health of workers.
· To
achieve main objectives of HSE safety standard and protection to health.
· To
pursue the goal of harm to environment and to protect the environment.
OBJECTIVES of
HSE:
Promoting
health
Protecting
the environment
Safe
guarding the property / equipments of
Promoting
harmonious relationship between the company and the community.
Environmental
safety (Major activities)
EIA : Environmental impact assessment
Water
pollution inspection /prevention
Through
Oil
chemical spill response
Garbage
Discharge Inspectional Inspection
Waste
segregation/storage
Sewage
discharge response, prevention treatment
House
keeping practices with the full aim of creating a lively environment for our
marine lives.
Health
safety: Minor:
Fire
safety
First
aid practices/programme
EIA procedures ensure that the potential
environmental impacts of project are identified assessed, managed and reduced to acceptable level before consent is given by
the regulatory authority this
process when integrated in any
business identifies, minimize the
potential impact of promoted
development the importance aspect of
EIA Studies includes
-
Risk
assessment
-
Environmental
management
-
Poor
product monitoring
EIA
is important because it addresses the direct and indirect impacts of the
project on
-
Human
being, fauna and flora
-
Soil,
water, air, climate to landscape
-
Materials
assists and cultural heritage
Step
I took in EIA process were
Screening
Preliminary
assessment
Scoping
Collection
of baseline data
Impact
prediction
Mitigation
measures /EIA report
EIA report
Public
hearing
Decision
making
Monitoring
and implementation
Screening:
this is done to decide whether an EIA is required and focus resources on
projects most likely to have significant impacts, those where impacts are
uncertain and those where EIA management
input is likely to be required
Scoping: This purpose of this key part of EIA process is to focus the EIA on the
environmental issues and possible
effects which need the most thorough attention
To
identify those issues which are unlikely to need detailed study, and to
provide a means to discuss method of assessing effects and reach agreement on those most appropriate
Here
all interested parties are involved
Collection of
baseline data: This aspect, the environmental character of
the areas likely to be affected were examined, relevant natural and man made
processes which may already be changing
the character of the where also identified
3. Impact prediction: Possible
interaction between the proposed development and both existing and future site conditions
were considered. The nature of the possible
effect eg positive or negative ,
temp, or permit were predicted and accessed, as well possible cumulative and in
combination effects.
MITIGATION
MEASURES
This
is a proposal for design and operational
modification or other measures to prevent, reduce, and where possible offset any significant adverse
effect on the environment
EIA reports : This is
where the actions and steps for preventing, minimizing or by
passing the impacts or else the level of
compensation for probable EIV damage or loss
Described
the dripping comprising into on the site,
design and size of development
Measure
envisaged in order to avoid, reduce,
and if possible, remedy significant adverse effect mitigation
MEASURES
Data
registration to identify and assess the main effects which the development is
likely to have on the EIV outline of the main alternatives studied by applicant
or appellate and an indication of the main reasons for
this choice taking into account the
environmental effect non technical summary of
the above into public hearing
: on
completion of EIZ report, public and
EAV groups living close to project site may be informed and consulted
Review
:To assess the adequacy of
the EIA to decision making and consider its implications for project implementation
Monitoring : The various
phase of the implementation of projects are monitored risk assessment here
the inventory analysis and hazard probability
and index are contained